EN
EN

Funding for charging infrastructure in multi-family buildings. Your cost estimate in two minutes.

Funding for charging infrastructure in multi-family buildings. Your cost estimate in two minutes.

Since April 2026, the Federal Ministry of Transport has been funding the expansion of charging infrastructure in residential complexes with up to €2,000 per charging point. To submit an application, you must have a plausible cost estimate. You can create it here — without an electrician, without waiting time, and without any cost.

€500 million

Funding volume

first come, first served

Up to

2.000 €

Per charging point

for pre-wiring, installation, and wallbox

Application window

April 15 to November 10, 2026

closed after that

Get a fundable cost estimate in three steps

Get a fundable cost estimate in three steps

01

Describe your project

Enter the number of parking spaces, planned charging points, cable route, and wall openings. The calculator is calibrated for real installation projects.

02

Generate the cost estimate

The system calculates the investment costs, broken down by trade, along with the federal subsidy and your own contribution after funding deduction. The document can be used for submission in the BMVI funding portal.

03

Leave your contact details and prepare the application

After generation, you receive the cost estimate as a PDF. An OLI contact person will get in touch for the technical coordination on-site.

OLI SystemsGmbH
Kostenvoranschlagsgenerator · Bundesförderung April 2026
Kostenkalkulator
Auf Basis realer Installationsprojekte kalibriert
Bidirektional (V2G/V2H)
Aktivieren, um bidirektionale Ladepunkte im Projekt vorzusehen
Infrastruktur & Installation16.180,00 €
Wallboxen (Keba KeContact P40)13.080,00 €
Gesamtkosten netto29.260,00 €
zzgl. 19 % MwSt.5.559,40 €
Gesamtkosten brutto34.819,40 €
Bundesförderung BMVI
18.000,00 €
12 LP × 1.500 € (Standard) · 52 % Förderquote
Ihr geschätzter Eigenanteil16.819,40 €
Bitte füllen Sie Empfänger, Anschrift, Telefonnummer und Objekt / Referenz aus, bevor Sie den Kostenvoranschlag generieren.
Bereit zur Kostenvoranschlagserstellung
Füllen Sie die Felder links aus und klicken Sie auf „Kostenvoranschlag generieren". Geben Sie Ihre Objektdaten ein – der Generator berechnet alle Kostenpositionen und erstellt ein druckfertiges PDF.

No electrician. No waiting time. Ready to use immediately.

No electrician. No waiting time. Ready to use immediately.

After the launch of the funding program, electricians are usually booked out very quickly. Without a cost estimate, you cannot submit an application. Without an application, you lose your place in the first-come, first-served process.

The OLI Generator creates a complete, structured cost estimate based on a standard service specification, including switch cabinet, IT infrastructure, cable route, charging points, and commissioning. The unit prices included are based on real installation projects and calibrated according to the current market situation.

OLI Systems also provides the load management backend required by the funding guideline. Funded charging points must be controllable to avoid expensive grid expansions. This is integrated into the OLI solution from the very first charging point.

The most important questions about BMVI funding

Who is eligible to apply?

What exactly is funded?

Do I have to equip all parking spaces immediately?

What is the minimum number of charging points required?

Why is load management mandatory?

Can I start before receiving funding approval?

Is the funding volume limited?

Secure your cost estimate and prepare your funding application

Secure your cost estimate and prepare your funding application

Secure your cost estimate and prepare your funding application

I agree that OLI Systems GmbH may use my data for offer preparation and contact purposes. Privacy policy.

The funding window is open. The budget is limited.

The funding window is open. The budget is limited.